Our more than able team, led by Sam and Sam, got to work. First, they assessed the structure, to ensure that we had foundations on which to build, and having calculated what safety work needed to be completed, they developed a complete 1:1 rebuild plan to take the site from a state of disrepair, to a thriving soft play centre once more.
The plan involved reusing as much of the existing steel as possible, which reduced waste and cut down on cost, while at the same time implementing the latest safety standards.
Then it was time to manufacture what was required and deliver to site.